About this Office
Industrial Floors Ghana’s Tema Heavy Industrial Area office — established at Plot 15, Heavy Industrial Area — has served as the operational anchor for specification-grade FM2 and FM3 superflat floor installations across Ghana’s most demanding industrial corridors since 1975. With 51 years of industrial track record, this location coordinates the full survey-to-handover cycle: laser-measured flatness assessments, DIN 18202 and ASTM F1869 moisture testing, slab construction scheduling, and post-installation certification sign-off for high-bay warehouses, pharmaceutical facilities, and cleanroom environments throughout the Greater Accra and Tema Industrial Zone.
The office operates within direct proximity to the free zones enclave, container terminals, and the heavy-manufacturing belt that defines Tema’s industrial geography. That proximity is deliberate — floor specification work of this technical register requires site-response times measured in hours, not days, and field teams stationed here move between active construction zones with the logistical fluency that only decades of working the same industrial corridors can build.
Sectors Served from Tema Heavy Industrial Area
- High-bay warehouse and distribution centre construction — FM2/FM3 flag-jointed superflat slabs
- Pharmaceutical manufacturing facilities requiring pharma-compliant, chemical-resistant floor systems
- Food-grade manufacturing plants with hygiene-classified joint-free surface specifications
- Cold storage and logistics facilities demanding moisture-tested, thermally stable concrete floor systems
- Heavy industrial installations — steel fabrication, cement processing, and mining-adjacent plant floors
Notable Project Patterns
Commissions routed through this office consistently follow a recognisable institutional pattern: a Tier-1 logistics operator or multinational manufacturer breaks ground on a high-bay facility within the Tema industrial belt, requires a laser-measured flatness certificate to FM2 standard as a condition of racking supplier approval, and engages Industrial Floors Ghana to deliver the slab, the measurement protocol, and the signed flatness report under a single accountable engagement. Food-grade and pharmaceutical clients additionally specify ASTM F1869 moisture testing prior to coating application — a requirement the site team executes as standard procedure, not an add-on.
Working Hours and Contact
Office: Plot 15, Heavy Industrial Area, Tema Telephone: +233 023 063 0004 Email: info@industrialfloorsghana.com
| Monday – Friday | 07:00 – 17:00 GMT |
| Saturday | 08:00 – 13:00 GMT |
| Sunday | Closed — emergency site enquiries by email |