Skip to content

Volta Region

Ho

Industrial Floors Ghana project execution across Ho's institutional, healthcare, educational sectors — Volta Regional Hospital, Ho Polytechnic, industrial corridor.

About this Office

Industrial Floors Ghana has maintained a specification-grade presence in Tema’s industrial corridor since 1975 — Ghana’s most consequential 51-year industrial flooring track record. The Tema Heavy Industrial Area office, located at Plot 15, Heavy Industrial Area, serves the dense concentration of warehouse operators, pharmaceutical manufacturers, and logistics principals who have made the greater Tema zone West Africa’s foremost industrial address. A second operational base at Block G, Free Zones Enclave, Tema, extends direct site-access capability into the Tema Free Zones — where cleanroom-grade tolerances and ASTM F1869 moisture-compliant substrates are specified as standard conditions of occupancy, not optional upgrades.

Both Tema locations operate as full-service coordination hubs: specification consultations, laser-measured flatness surveys, DIN 18202 compliance reviews, and site mobilisation planning are conducted on-premises. Clients commissioning high-bay racking installations, pharma-licensed production floors, or cold-chain logistics slabs engage the Tema offices as the primary technical point of contact from pre-tender through to laser-verified handover.

Sectors Served from Tema

Notable Project Patterns

The Tema operational zone consistently surfaces a concentrated project typology: high-bay distribution centres designed for very narrow aisle racking, where FM2 superflat tolerances are a non-negotiable equipment specification; pharmaceutical manufacturing buildings where ASTM F1869 moisture testing and cove-to-wall detailing are written into the building permit conditions; and food-grade processing facilities where slip-resistance coefficients, drainage gradients, and hygienic coating systems are reviewed by regulatory inspectors prior to commissioning. Across 51 years of industrial practice, the project record from this corridor demonstrates one consistent finding — floor systems specified to FM2 and installed with laser-measured verification require no remedial intervention over the operational lifecycle that informally-specified floors cannot match.

Working Hours and Contact

Industrial Floors Ghana — Tema Offices

Monday – Friday07:00 – 17:00 GMT
Saturday08:00 – 13:00 GMT
SundayClosed

Telephone: +233 230 630 004 Email: info@industrialfloorsghana.com