Skip to content

Central Region

Cape Coast

Industrial Floors Ghana project execution across Cape Coast's UCC campus, hospitality corridor, and Castle-Quarter institutional commissions.

About this Office

Industrial Floors Ghana has maintained a specification-grade installation presence across Tema’s industrial corridors since 1975 — a 51-year operational history that spans the formation of Ghana’s heavy industrial belt, the expansion of Free Zones manufacturing, and the emergence of cleanroom-grade facilities along the Tema coastline. The Heavy Industrial Area office, situated at Plot 15, serves as the primary technical coordination point for high-bay warehouse commissions, pharmaceutical manufacturing floors, and food-grade production facilities across the eastern industrial zone. The Free Zones Enclave office at Block G complements this reach with direct proximity to bonded manufacturing clients requiring FM2/FM3 certification documentation aligned to international procurement standards.

Both locations operate under a unified technical methodology: every engagement is governed by laser-measured flatness reporting, DIN 18202 tolerance verification, and ASTM F1869 moisture testing — documentation that Tier-1 industrial clients require at tender stage, not as an afterthought.

Sectors Served from Tema

Notable Project Patterns

Tema’s industrial density produces a recurring project profile: high-bay logistics facilities requiring VNA-compatible FM2/FM3 superflat slabs with laser-measured flatness certificates, pharmaceutical manufacturers commissioning GMP-aligned floor systems across production and filling suites, and food-processing operators specifying slip-rated, chemically resistant surfaces with integrated drainage channels. Cold storage commissions in the port-adjacent logistics belt add a further layer of technical complexity — thermal movement joints, vapour barriers, and freeze-cycle slab engineering that demands the kind of measured, documented approach Industrial Floors Ghana has delivered across five decades of practice. Every project concludes with a signed flatness report, a moisture test record, and a specification-compliance certificate — the standard the industrial market has come to associate with floors built to FM2, measured, certified, and signed.

Working Hours and Contact

Industrial Floors Ghana — Tema Offices

Phone+233 230 630004
Emailinfo@industrialfloorsghana.com
Monday – Friday07:00 – 17:00 GMT
Saturday08:00 – 13:00 GMT
Sunday / Public HolidaysClosed