Skip to content

Greater Accra

Accra

Industrial Floors Ghana headquarters serves Greater Accra's institutional-industrial client base — Spintex Industrial pharma manufacturing, Airport Industrial electronics assembly, North Industrial logistics warehouses.

About this Office

Industrial Floors Ghana has operated within the Tema industrial corridor since 1975 — fifty-one years of FM2-grade superflat floor construction delivered to the warehouses, pharmaceutical facilities, and heavy industrial plants that define Ghana’s manufacturing backbone. The Tema Heavy Industrial Area office sits at the centre of the nation’s most specification-intensive flooring environment: high-bay racking systems, forklift-trafficked concrete slabs, and cleanroom-grade substrates that demand laser-measured flatness, ASTM F1869 moisture certification, and DIN 18202 compliance from the first pour. Clients commissioning floors at this location receive the full technical authority of a 51-year industrial track record — measured, certified, signed.

The Free Zones Enclave satellite location extends that reach directly into Ghana’s export-oriented manufacturing precinct, where pharmaceutical packaging lines, electronics assembly facilities, and cold-chain logistics operators require FM3 and FM2 superflat tolerance on an accelerated programme schedule. Both offices operate under a unified PMO structure, sharing laser flatness instrumentation, site quality protocols, and the same specification-grade sign-off discipline that has defined the Industrial Floors Ghana working method since establishment.

Sectors Served from Tema

Notable Project Patterns

The Tema corridor consistently generates the most technically complex commissions in the Industrial Floors Ghana project portfolio. Engagements at this location have included high-bay distribution facilities with racking configurations exceeding twelve metres, pharmaceutical manufacturing plants requiring validated cleanroom-grade floor substrates, and food-grade processing facilities specifying chemical-resistant sealed systems across multiple production zones. In each case, the project record begins with a laser flatness survey, proceeds through pour sequencing designed to hit FM2 tolerance, and closes with a certified flatness report — documentation that satisfies both facility operators and their international certification bodies.

Working Hours and Contact

Industrial Floors Ghana — Tema Industrial Offices

Technical enquiries are received directly by the project specification team. For FM2/FM3 commissioning, flatness survey scheduling, or industrial coating specification, contact the Tema office to initiate a site assessment.