Skip to content

Case Studies

Real Ghana projects, named clients where permitted.

Automotive Manufacturing · Tema, Ghana

Automotive Manufacturing Paint Shop — Tema Industrial

Automotive manufacturing paint shop commission requiring 3200 sqm specification-grade industrial epoxy with solvent-resistant chemistry and ATEX-classified system specification. Industrial Floors Ghana delivered substrate moisture remediation, chemical-resistant multi-coat application, and full QC documentation against automotive-industry quality regimes.

Electronics Manufacturing · Accra, Ghana

Electronics Assembly ESD Cleanroom — Airport Industrial Accra

Electronics assembly cleanroom commission requiring 1600 sqm IEC 61340-5-1 conductive epoxy with continuity-tested grounding network. Industrial Floors Ghana installed copper grounding network, conductive primer, conductive topcoat, and full IEC 61340-5-1 commissioning documentation.

FMCG Production · Tema, Ghana

FMCG Distribution Warehouse — Free Zones Tema

FMCG distribution warehouse commission requiring 6000 sqm diamond-polished concrete with FF50+ floor flatness for sustained 10-tonne forklift traffic. Industrial Floors Ghana delivered phased multi-shift coordination against active distribution operations and full documentation for FMCG quality-management audits.

Food Processing · Tema, Ghana

Food-Processing Wash-Down Facility — Tema Heavy

Food-processing facility commission requiring 2800 sqm FDA-compliant hygienic epoxy with seamless coved bases, antimicrobial finish, and multi-shift wash-down resistance. Industrial Floors Ghana coordinated phased installation against active food-production calendar with full HACCP-aligned QC documentation.

Pharmaceutical Manufacturing · Accra, Ghana

Pharmaceutical Manufacturing Hall — Spintex Industrial

Pharmaceutical manufacturing hall commission requiring 2400 sqm ISO 14644 Class 8 cleanroom-adjacent epoxy with IEC 61340-5-1 ESD integration. Industrial Floors Ghana coordinated substrate moisture verification, multi-coat application discipline, ESD grounding network installation, and continuity-tested commissioning.